JL extended this older terrace house with a new car porch, a balcony and a master bedroom, plus tiling. The photos on this page cover the structure, from footings in September 2023 to the plastered upper walls in December 2023.

Taman Asean house extension: plastered walls of the new upper-floor room under a blue sky
JL / BUILT SPACES

01 / Scope

What the Taman Asean house extension included

  • Car porch extension at the front of the house
  • Pad footings, ground beams and a new reinforced ground slab
  • Concrete columns and a reinforced slab over the porch
  • Balcony extension
  • Master bedroom extension
  • New brick and block walls, plastered
  • Tiling

02 / How it went

How the job went

In September 2023 the old porch tiles were broken up and the front yard was dug for footings and ground beams, then meshed and cast as a new slab. From late September to October 2023 the columns went up and the porch roof slab was propped, reinforced and poured. In November and December 2023 the upper walls were built in brick and block and plastered, and the latest photo, from January 2024, still shows scaffolding at the front. Photos of the finished porch and balcony will be added when they are available.

03 / Project progress

Project progress

Choose a space to explore its progress. Select any photograph to view the full image.

Taman Asean

44 photographs

Balcony

During

Car porch

During

Exterior

Before
During
After

Roofing

During