02 / How it went
Where the job is now
In June 2026 the corner-lot house stood empty, with an overgrown yard on two sides. In August the yard was cleared and levelled by backhoe, reinforced and cast in concrete, and the brick boundary wall and the extension room went up and were plastered. In September the car porch, driveway and side yards were tiled; by mid-September the porch and driveway were done, while the extension room was still roofless, with plastered walls not yet painted.
We’ll add photos to this page as the job moves on.