02 / How it went
How the job went
In October 2024 the side yard was overgrown and the original porch ceiling was stained. From January 2025 the yard was cleared and piled, then ground beams and slabs were cast along the side of the house. Columns and a first-floor slab followed in February and March 2025, and the rooms were being tiled by July 2025. The April 2026 photos show the finished porch roof, kitchen, bedrooms and built-in cabinets.