02 / How it went
How the job went
The before photos (December 2019) show the old house with its car porch, side garden and a narrow back yard under a blue awning. From March to June 2020 the photos follow the extension: excavation and footings, rebar for the ground slab, brick walls with window openings and the upper slab, with the side lane concreted beside the new fencing wall. By November 2020 the extension walls were plastered and new windows fitted. The interior photos from September to December 2023 show the carpentry, kitchen, staircase wall and glass-roof awning finished.