02 / How it went
How the job went
In October 2024 the house stood empty, with a lawn at the back, a stained roof terrace and a faded white gate. In November 2024 the terrace tiles were hacked off and relaid, and the rear garden was dug and prepared for the new floor slab. By late December 2024 the columns and beams of the rear extension were up, and the new gate was in by February 2025. The March 2025 photos show the finished extension with glass sliding doors, the new kitchens and the stair cladding.