02 / How it went
Where the job is now
The house was photographed in August 2025: a stained two-storey terrace with an old awning-roofed balcony, an open-tread timber stair and original bathrooms. Work started in September 2026, when the front yard was screened with tarps and broken out by backhoe for footings. Ground beams were then cast, the slab mesh was laid and the whole front yard was poured as a new slab, and later that month starter bars and column formwork were going up. Inside, work so far is limited to hacking, new pipes and a new brick wall in the side passage.
We’ll add photos to this page as the job moves on.