02 / How it went
How the job went
In December 2024 the unit was empty: floors down to bare screed, grey half-height tiles in the kitchen and loose wires in the ceiling. By March 2025 the black and white octagon floor tiles were down, white subway tiles were going up in the kitchen and ceiling boards were being fixed. The July 2025 photos show the finished rooms: moulded walls, arched shelving, glass partitions, the walk-in wardrobe and the bunk-bed room.