02 / How it went
How the job went
In May 2024 the unit was empty: bare concrete floor, exposed red ceiling pipes and full-height windows on two sides. By late May, board partition walls were up to divide the space into rooms. The August 2024 photos show the finished studio with glass partitions, timber-look flooring, linear LED strips and sheer curtains softening the daylight from the windows.