02 / How it went
How the job went
In July 2024 the ceiling was already up and gypsum boards were going in along the shop. By the end of July the arched shelving had been formed in gypsum and skim-coated. In late August the shelving was painted, the glass-block wall and teal counter were in, the timber-look floor was down and the pendant lights were hung. The finished photos are from October 2024, with LED light along the arches and the treatment beds in place.