02 / How it went
How the job went
In August and September 2024 the houses were photographed empty, with tiled floors, bare walls and an open porch void below the upper balcony. Finished interiors follow in separate sets from November 2024 to February 2026, each in its own style: marble-look with wood-look, black shaker-style with wall mouldings, wood-look with white, and dark grey with display cabinets. The February 2026 photos also show a new steel-frame roof awning over an upper terrace.